FRC (fast rescue craft) replacement project
Bostmar team successfully completed FRC replacement project while vessel is in operation.
Jobs performed:
1) Steel reinforcements underneath new davit.
2) Power cable pulling and power unit connection.
3) Replacement of davit.
4) Welding works as per class approved drawings.
5) Cabins and ventilation system dismantling / mounting works.
6) Load testing.
- Client:
- Industry:
- Services:
- Date:
- Stena Line
- Maritime
- Shiprepair, modification
- 2023, July 1st